Airtightness Detailing and Strategy | Zureli

Airtightness Detailing and Strategy

picture-featured
picture featured

Airtightness Detailing and Strategy

Airtightness is a vital element of a building, especially when constructing to the Passivhaus standard because excessive air leakage can lead to more energy being consumed and a draughty/ leaky building. Therefore the need to eliminate areas of air leakage is extremely important. Less leaky buildings also offer more comfort to the user.

Airtightness Strategy Report

We can prepare an airtightness strategy report that can be used at on-site induction by the design and construction team which will include an introduction on the importance of airtightness. The report will be presented in a practical manner and will also include pictures, diagrams and references to further information and product details such as airtightness tapes. If desired, we can also run a practical workshop to show contractors how to install the airtightness tape.

We can provide detail drawings to aid with building airtightness. These details will cover areas where airtightness is particularly key and show how they should be made airtight. Key areas may include:(this list is not exhaustive)

Windows

Doors

Junction between the ground floor and wall

First floor junction

Service penetrations

Loft hatch

Roof & eaves

Supporting Devel

  • Region: Europe
  • Country: United Kingdom
Request for Information
  • {{ error }}
By clicking on Send, I declare that I have read and accept Zureli`s terms and conditions and privacy policy.
  • Request sent successfully.